Liquid Filling Machine Process:
I. Raw Material Preparation
1.Inspect the liquid raw material in the storage tank to ensure the quality is up to standard and the quantity is sufficient for production needs.
2.Transfer the appropriate amount of raw material into the 4 head liquid filling machine in preparation for the filling process.
3.Adjust the filling volume on the Automatic four head volumetric liquid filling machine according to product specifications.
II. Bottle Conveyance
1.Transport empty bottles to the entrance of the filling machine with 4 heads via the conveyor belt system.
2.Ensure the conveyor operates smoothly, and the bottles are neatly aligned for a seamless transition into the filling process.
III. Washing and Sanitization
1.Before bottles enter the 4 head automatic piston liquid filling machines area, utilize the washing apparatus to clean the inside and outside of the bottles thoroughly.
2.Sanitize the washed bottles with disinfection equipment to ensure hygienic safety of the final product.
IV. Filling and Measurement
1.Dispense the prepared raw material into bottles using the filling nozzles of the automatic four-head liquid filling machine.
2.An accurate metering system within the automatic four-head liquid filling machine guarantees that each bottle receives the preset standard amount of liquid.
V. Sealing and Labeling
1.After filling, apply caps to the bottles with a capping machine to prevent any liquid from leaking.
2.Subsequently, affix product labels detailing the product name, production date, expiration date, and other relevant information.
VI. Boxing and Palletizing
1.Pack the sealed and labeled bottles into boxes for shipment.
2.Employ a palletizing machine to neatly stack boxes, facilitating easy storage and transportation.
VII. Product Dispatch
1.Conduct a quality inspection of the palletized boxes to ensure the product meets dispatch criteria.
2.Complete the dispatch form, recording product details such as name, quantity, production date, and batch number.
3.Transport the goods to the designated shipping area, ready for dispatch.
Throughout the Automatic four head volumetric liquid filling machine process, it is crucial to strictly follow operating procedures to maintain product quality and safety. In addition, regular equipment inspections and maintenance should be performed to guarantee the machinery's proper function and production efficiency.